TilliT
HomepageChangelogDeveloper
  • Home
  • Introduction to TilliT
    • Introduction for New TilliT Customers
    • Videos
  • Getting Started
    • Overview
    • Definitions
    • Set up a Site & Assets
    • Set up an Activity
    • Create an Order
    • Start an Order
    • Next steps
  • Planning
    • Overview
    • Data Gathering
      • Site & Assets
      • Production Orders
      • Activities
      • Shifts & Calendars
      • Materials
      • Process Variables
      • Attributes
      • Articles
      • Checklist
  • Knowledge Base
    • Everyday Usage
      • Layout Overview
      • Login to TilliT
      • Basic functionality
      • Lock screen
      • Pinning Assets
      • Switch Site
      • Next Steps
      • Activities
        • Claiming
        • Completing
        • Manually starting
      • Orders
        • Create adhoc Order
      • Events
        • Raising an Event Using the UI
      • Notifications
    • Scheduler
      • Introduction
      • Feature Overview
      • Scheduler to Digital Operations integration
      • Scheduling
        • Scheduling
        • Orders
        • Scenarios
        • Inventory
      • Configuration
        • Operations
        • Equipment
        • Personnel
        • Materials
        • Availability
        • Optimisation
        • Changeovers
        • Loading data with excel Add-in
      • MVP Setup Guide
    • Insights
      • Activity report
      • Production Report
      • Dashboards
      • Advanced Analytics
        • Sharing dashboard
    • Users
      • User
        • User Confirmation
        • User channels
        • User subscriptions
      • Groups
      • Permissions
      • User authentication with SSO
    • Boards
    • Settings
      • Asset Hierarchy
        • Site
        • Asset
          • Asset Attributes
          • Asset Tolerances
          • Downtime periods
          • Attribute Group
          • Edge data tags
        • Asset class
        • Order Templates
          • Order Template with Unit Conversion
        • Calendar
          • Calendar item
        • Shifts Templates
          • Creating Shift Templates
          • Manual shift patterns
        • Asset Meter
      • Material Definition
        • Material
        • Material group
        • Material attributes
          • Example of material attributes
        • Material tolerance
          • Example of Material tolerance
        • Material component
        • Material conversion
      • Activity Templates
        • Activity template
          • Creating an activity
          • Where
          • When
          • Versioning
          • Building
          • Elements
            • Item types
              • Item properties
                • Active item & hidden expressions
                • Hint
                • Tolerance Source
              • Update Attribute
              • Board Item
              • Raise event
            • Data Types
              • Evaluate Data types & Dynamic Note
              • Note
              • Option list
              • Dynamic option list
              • Barcode
              • GS1 Barcode Scanner
              • Edge data
              • Material Component
              • Image capture
              • Sections
              • Digital Signature
              • Material
              • Dynamic Form Items
              • Inventory Key
        • Activity class
      • Events
        • Event Type
        • Event Relay
        • Event Schedule
      • Articles
      • Integrations
        • Adding Webhook Subscriptions
        • MQTT Integration
        • Receive the TilliT Event
        • Notifications
      • Configuration
        • Attribute
        • Attribute group
        • Tolerances
        • Dashboard group
        • Report Templates
          • Creating and Using Report Templates
        • Process variable
        • Unit of Measure
        • Run Rate Template
      • Translation
      • Audit Log
    • Edge
      • Introduction
      • Before You Start
        • Security / Firewall
        • TilliT Edge
        • Understanding your Networks
        • Common Installation Solutions
        • Managing and Publishing changes
      • Physical Device
        • Setup
      • Using Docker
        • Upgrading a docker container from before 2025
      • Common Data Sources
        • OPC-UA
        • Modbus TCP
        • Ethernet IP
        • Profinet
        • RTLE
        • Simulator
      • Data Tags
        • Data Tag Templates
        • Order Number Tag Template
        • Edge Data Tag Options
      • Edge Triggers
      • TilliT Sensors
        • Connect TilliT Edge to a Wireless Gateway
        • Bind a Wireless Counter to a Wireless Gateway
        • Configure FEN-20 PNP Sensor
      • Troubleshooting
      • Windows Edge Installer
    • History
    • OEE
      • Two Steps to Availability
      • Two Steps to Performance
      • A Step to Quality
    • Track and Trace
      • Before you begin
      • Transaction Types
      • Movement Types
      • Movement Types Field
      • Adding Material Movement to an Activity Template
      • Completing the Activity
      • Reporting
    • Mobile View
      • Device shortcut
      • Unable to enter Negative Numbers
    • Importing, Exporting and Cloning Entities
    • Troubleshooting
  • Tools
    • Excel add-in
      • How to Install the Excel Add-in
        • Excel Online
        • Desktop
      • How to Update the Excel Add-in
      • Loading multiple orders
      • Maintaining Master Data in Bulk
      • Downloading Time-Series Data
    • Staging Environment
    • Ignition Module
      • Installation
      • TilliT Tag Provider
        • Data From TilliT to Ignition
        • Data From Ignition To TilliT
      • Scripting Using the TilliT Module
      • Network Security
  • INFRASTRUCTURE
    • FAQ
    • Architecture
    • Disaster Recovery
    • Software Quality Assurance
Powered by GitBook
On this page
  • Ready and Start Order
  • Claim and complete Activity
  • Recap
  1. Getting Started

Start an Order

Now the asset, order and activity is setup lets start the order.

PreviousCreate an OrderNextNext steps

Last updated 9 months ago

Ready and Start Order

Navigate to Orders.

Assuming that the previous steps were completed successfully, you should now be able to see the Order we created in the list. Click on the Order to access its details.

Take note of the Activities Details i.e. Activities open , skipped , non-conforming

Let's ready the order - click the Ready Order button and then click Ready

Next let's start the order - click Start Order button and then click Start

The order status will change to Running and 1 Activity should now be open.

Click on the Activities card to reveal the Activities column. You should see the Pre Start Check Activity in the list.

Claim and complete Activity

On the activity click Claim. This will change the Activity status to claimed with the details of who claimed it ,when it was claimed etc.

Click Pass on the activity card to indicate that the activity step has passed. Then click Submit.

Recap

  • In the Setup section, we added an asset and a material, and then set up an order with the asset and material we had created.

  • In the Orders section, we initiated the order and added order details like the Order Number and Target Quantity.

  • We then proceeded to create an activity called "Pre start up check" that would be triggered at the start of the order.

  • The activity had a pass/fail element that the operator would have to acknowledge.

This is a basic example of how you can use TilliT to manage orders, activities, assets, and materials. By utilising these features, you can streamline your business processes and ensure that everything runs efficiently.

Congratulations you have now completed your first activity on TilliT.

🎉